line 5

Our pre-olympics uncle. Running from North to South, Line 5 opened in 2007, being the first to run to north to south, from Tiantongyuan North to Songjiazhuang. It runs through old neighborhoods to residential areas, with 6 transfers. It is 27.6 km long, passing 26 stations, going both underground and above ground.

0 0
  • Parte del discurso: noun
  • Industria/ámbito: Transporte
  • Categoría:

Subway Lines in Beijing

Categoría: Other

Cantidad total de términos: 6

Other terms in this blossary

Creador

  • tula.ndex
  • (Zimbabwe)

  •  (Bronze) 496 puntos
  • 100% positive feedback
© 2024 CSOFT International, Ltd.