line 2

More like the young brother of line 1. Constructed a decade and a half later in 1984. The busiest of all subways, line 2 had meager beginnings. It started as a horseshoe in shape, running through 16 stations from Fuxingmen, to Jianguomen, and 16 km long. In 1987 the two existing lines became one line, making a loop. in 1992 extension to line 1 was made, making them separate lines ones more.

Now, great uncle Line 2, runs through 18 stations and 7 transfers.

0 0

Subway Lines in Beijing

Categoría: Other

Cantidad total de términos: 6

Other terms in this blossary

Creador

  • tula.ndex
  • (Zimbabwe)

  •  (Bronze) 496 puntos
  • 100% positive feedback
© 2024 CSOFT International, Ltd.